3500 South Terminal Rd
Houston, TX 77032 · City Of Houston - Houston Airport System Division
Terminal C plans 17,000-square-foot office and shop buildout
A 17,000-square-foot buildout will add office and shop space, restrooms, a breakroom and locker rooms to a storage area under the Terminal C concourse at Houston’s airport. The project was registered with the Texas Department of Licensing and Regulation on December 19, 2025. The applicant’s estimated project cost is $5.4 million.
Summarized from Texas Department of Licensing and Regulation records · updated Dec 19, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 19, 2025
- since Dec 19, 2025
- Largest scope
- 17,000 sf
- Estimated cost
- $5.4M
- state registration
Where this project stands
Inspected · closing outTerminal C Facilities Space Centralization Project
17,000 sq ft · $5.4M est.
- RegisteredDec 19, 2025
- Plan review
- ConstructionFeb '26 – Jul '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectBuildout new office space and shop space in exterior lower ramp0 level storage area under concourse. this will include new restrooms, new breakroom, locker rooms, office space and shop areas. it will also include enclosing area for interior space w — iah airport
TDLR project registrationRenovation/AlterationInspection Complete17,000 sq ft$5.4M est.- Project #
- TABS2026008559
- Tenant / owner
- Terminal C Facilities Space Centralization Project
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3500 South Terminal Rd
What is being built at 3500 South Terminal Road in Houston?
A 17,000-square-foot buildout will create office and shop space, restrooms, a breakroom and locker rooms in a storage area under the Terminal C concourse. The TDLR registration is for a renovation or alteration.
When was the Terminal C Facilities Space Centralization Project registered?
The project was registered with TDLR on December 19, 2025, under project number TABS2026008559.
How much will the Terminal C buildout cost?
The applicant’s estimated cost for the project is $5.4 million. This is an estimate, not a confirmed final cost.
How large is the Terminal C Facilities Space Centralization Project?
The registered project covers 17,000 square feet in a storage area under the Terminal C concourse.
What facilities are included in the Terminal C project?
The registration describes new office and shop areas, restrooms, a breakroom and locker rooms.
What is being built near Lone Star Mercantile at Terminal C?
A 17,000-square-foot office and shop buildout is planned in a storage area under the Terminal C concourse. The project was registered on December 19, 2025.
Is the Terminal C space project complete?
The TDLR registration lists the project status as “Inspection Complete.” The registration describes a renovation or alteration in a 17,000-square-foot area.
Also being built nearby
All of 77032- 3500 South Terminal Rd Terminal E, Level 2 · Iah AirportOct 27, 2025Terminal e pedestrian bridge/storage modifications — renovation/alteration — install new wall to establish larger storage room. replace existing 3 foot door with new 4 foot door in same location
- 3500 S. Terminal Road · Iah Terminal CSep 10, 2024Terminal c - ppbm relocation — renovation/alteration — interior renovations for terminal c including relocation of ppbm office to terminal c, renovation of existing bathroom, new coffee bar, addition of power, data, and furniture
- 3575 S Terminal RdSep 6, 2023Term c concrete road way restoration - bsg-2023-28-iah · 37 m away
- 3500 S Terminal RdMay 5, 2025Terminal c ppbm relocation - bsg-2024-266-iah · 104 m away
- 3500 S TerminalFeb 27, 2025Ua - en23-b tbt c40-c41 - vdgs relocation - bsg-2024-376-iah · 104 m away
- 3550 N Terminal C Rd GarJul 11, 2025Iah termc garage signage & wayfinding -pn794g - bsg-2024-111-iah · 111 m away
- 3500 N Terminal C Rd Se216Apr 22, 2025Bsg-2024-246-iah - ua - united airlines (iah) terminal c ramp remo · 125 m away
- 3500 N Terminal C 200Jun 13, 2024Popeyes - bsg-2023-314-iah · 125 m away
- 3500 N TerminalJul 31, 2024Ua - iah d1 & c43 tunnels temporary drainage - bsg-2024-42-iah · 125 m away
- 3500 N Terminal C Rd Cs719Apr 17, 2025Garrett popcorn signage - bsg-2023-222-iah · 125 m away
- 3500 N Terminal Rd Cs720Sep 10, 2025Health review only bsg-2025-63-iah · 125 m away
- 3500 N Terminal C 201Sep 8, 2025Velvet taco remodel - bsg-2025-44-iah · 125 m away
More warehouses & industrial in 77032, new homes in 77032, offices in 77032.