3575 S Terminal Rd
Houston, TX 77032
3575 S Terminal Rd: 3 projects on record
City of Houston lists 3 filings across 3 projects at 3575 S Terminal Rd, Houston, TX 77032 since December 18, 2019. The most recent, filed September 6, 2023, covers: “Term c concrete road way restoration - bsg-2023-28-iah”.
Compiled from City of Houston records · updated Sep 6, 2023
- Projects
- 3
- 3 filings
- Latest filing
- Sep 6, 2023
- since Dec 18, 2019
- Largest scope
- —
- Listed value
- —
Where this project stands
Permitted 2023 · no recent filingsTerm c concrete road way restoration - bsg-2023-28-iah
- Building permitSep 6, 2023
- Trade permits
- Occupancy
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
Permit & project history
3 projectsSources: City of Houston
Questions about 3575 S Terminal Rd
What is being built at 3575 S Terminal Rd?
The latest filing (City of Houston permit 23084803, September 6, 2023) covers term c concrete road way restoration - bsg-2023-28-iah.
How many permits and filings does 3575 S Terminal Rd have?
3 filings across 3 projects, from December 18, 2019 to September 6, 2023.
What is being built near Iah Airport in Houston?
3575 S Terminal Rd is about 37 m from Iah Airport (3500 South Terminal Rd Terminal E, Level 2). Its latest filing is for term c concrete road way restoration - bsg-2023-28-iah.
Is there other construction near 3575 S Terminal Rd?
Yes. Nearby filings include 3500 South Terminal Rd Terminal E, Level 2 (terminal e pedestrian bridge/storage modifications — renovation/alteration — install new wall to establish larger storage room. replace existing 3 foot door with new 4 foot door in same location, Oct 27, 2025); 3500 South Terminal Rd (terminal c facilities space centralization project — renovation/alteration — buildout new office space and shop space in exterior lower ramp0 level storage area under concourse. this will include new restrooms, new breakroom, locker rooms, office space and shop areas. it will also include enclosing area for interior space w, Dec 19, 2025); 3500 S. Terminal Road (terminal c - ppbm relocation — renovation/alteration — interior renovations for terminal c including relocation of ppbm office to terminal c, renovation of existing bathroom, new coffee bar, addition of power, data, and furniture, Sep 10, 2024).
How do I get alerts for new permits at 3575 S Terminal Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 77032- 3500 South Terminal Rd Terminal E, Level 2 · Iah AirportOct 27, 2025Terminal e pedestrian bridge/storage modifications — renovation/alteration — install new wall to establish larger storage room. replace existing 3 foot door with new 4 foot door in same location · 37 m away
- 3500 South Terminal Rd · City Of Houston - Houston Airport System DivisionDec 19, 2025Terminal c facilities space centralization project — renovation/alteration — buildout new office space and shop space in exterior lower ramp0 level storage area under concourse. this will include new restrooms, new breakroom, locker rooms, office space and shop areas. it will also include enclosing area for interior space w · 37 m away
- 3500 S. Terminal Road · Iah Terminal CSep 10, 2024Terminal c - ppbm relocation — renovation/alteration — interior renovations for terminal c including relocation of ppbm office to terminal c, renovation of existing bathroom, new coffee bar, addition of power, data, and furniture · 37 m away
- 3500 S Terminal RdMay 5, 2025Terminal c ppbm relocation - bsg-2024-266-iah · 138 m away
- 3500 S TerminalFeb 27, 2025Ua - en23-b tbt c40-c41 - vdgs relocation - bsg-2024-376-iah · 138 m away
- 3550 N Terminal C Rd GarJul 11, 2025Iah termc garage signage & wayfinding -pn794g - bsg-2024-111-iah · 146 m away
- 3500 N Terminal C 200Jun 13, 2024Popeyes - bsg-2023-314-iah · 154 m away
- 3500 N Terminal C Rd Se216Apr 22, 2025Bsg-2024-246-iah - ua - united airlines (iah) terminal c ramp remo · 154 m away
- 3500 N Terminal C Rd Cs719Apr 17, 2025Garrett popcorn signage - bsg-2023-222-iah · 154 m away
- 3500 N TerminalJul 31, 2024Ua - iah d1 & c43 tunnels temporary drainage - bsg-2024-42-iah · 154 m away
- 3500 N Terminal C 201Sep 8, 2025Velvet taco remodel - bsg-2025-44-iah · 154 m away
- 3500 N Terminal Rd Cs720Sep 10, 2025Health review only bsg-2025-63-iah · 154 m away