groundranger
Historic · latest filing Sep 2023Residential

3575 S Terminal Rd

Houston, TX 77032

3575 S Terminal Rd: 3 projects on record

City of Houston lists 3 filings across 3 projects at 3575 S Terminal Rd, Houston, TX 77032 since December 18, 2019. The most recent, filed September 6, 2023, covers: “Term c concrete road way restoration - bsg-2023-28-iah”.

Compiled from City of Houston records · updated Sep 6, 2023

Projects
3
3 filings
Latest filing
Sep 6, 2023
since Dec 18, 2019
Largest scope
—
Listed value
—

Where this project stands

Permitted 2023 · no recent filings

Term c concrete road way restoration - bsg-2023-28-iah

  1. Building permitSep 6, 2023
  2. Trade permits
  3. Occupancy

The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.

Permit & project history

3 projects
  1. Term c concrete road way restoration - bsg-2023-28-iah

    City of Houston permitBuilding
    Project
    23084803
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

    TERM C CONCRETE ROAD WAY RESTORATION - BSG-2023-28-IAH

  2. United airlines-terminal c-induction point-bsg-2021-72-iah

    City of Houston permitBuilding
    Project
    21061844
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

    UNITED AIRLINES-TERMINAL C-INDUCTION POINT-BSG-2021-72-IAH

  3. Terminal c bhs replacement-early baggage storage b- bsg-19-113-iah

    City of Houston permitBuilding
    Project
    19145812
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

    TERMINAL C BHS REPLACEMENT-EARLY BAGGAGE STORAGE B- BSG-19-113-IAH

Sources: City of Houston

Questions about 3575 S Terminal Rd

What is being built at 3575 S Terminal Rd?

The latest filing (City of Houston permit 23084803, September 6, 2023) covers term c concrete road way restoration - bsg-2023-28-iah.

How many permits and filings does 3575 S Terminal Rd have?

3 filings across 3 projects, from December 18, 2019 to September 6, 2023.

What is being built near Iah Airport in Houston?

3575 S Terminal Rd is about 37 m from Iah Airport (3500 South Terminal Rd Terminal E, Level 2). Its latest filing is for term c concrete road way restoration - bsg-2023-28-iah.

Is there other construction near 3575 S Terminal Rd?

Yes. Nearby filings include 3500 South Terminal Rd Terminal E, Level 2 (terminal e pedestrian bridge/storage modifications — renovation/alteration — install new wall to establish larger storage room. replace existing 3 foot door with new 4 foot door in same location, Oct 27, 2025); 3500 South Terminal Rd (terminal c facilities space centralization project — renovation/alteration — buildout new office space and shop space in exterior lower ramp0 level storage area under concourse. this will include new restrooms, new breakroom, locker rooms, office space and shop areas. it will also include enclosing area for interior space w, Dec 19, 2025); 3500 S. Terminal Road (terminal c - ppbm relocation — renovation/alteration — interior renovations for terminal c including relocation of ppbm office to terminal c, renovation of existing bathroom, new coffee bar, addition of power, data, and furniture, Sep 10, 2024).

How do I get alerts for new permits at 3575 S Terminal Rd?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 77032

More warehouses & industrial in 77032.

Email me when a new permit is filed