5010 Matilda St
Dallas, TX 75206
Electrical service riser repair permitted at 5010 Matilda St
A City of Dallas commercial electrical permit indicates a repair to the overhead service riser at 5010 Matilda St, where the whole building had no power. The permit was filed November 4, 2025 (COM-ELC-25-002854).
Summarized from City of Dallas records · updated Nov 4, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 4, 2025
- since Nov 4, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 5010 Matilda St
What is happening at 5010 Matilda St?
A commercial electrical permit indicates a repair to the building’s overhead service riser. The permit record says the whole building had no power.
Is a new building being built at 5010 Matilda St?
The available record is for an electrical repair, not a new building. It was filed November 4, 2025, as permit COM-ELC-25-002854.
When was the electrical permit filed for 5010 Matilda St?
The City of Dallas permit was filed November 4, 2025. Its number is COM-ELC-25-002854.
Why was work permitted at 5010 Matilda St?
The permit description says the work is to repair the overhead service riser. It also notes that the whole building had no power.
What work is happening near Atelier Yoga on Greenville Avenue?
At 5010 Matilda St, near Atelier Yoga at 4912 Greenville Ave, a City of Dallas permit indicates an overhead service riser repair. The permit was filed November 4, 2025.
Also being built nearby
All of 75206- 5026 Matilda StAug 11, 2025Replace 2 ton above the tub straight electric hvac system · 24 m away
- 5806 Birchbrook DrAug 27, 2026Replacing 2 ton above the tub unit · 29 m away
- 5816 Birchbrook DrNov 7, 2025Replace 3 ton heat pump system · 36 m away
- 5088 Matilda StJun 8, 2026Removal of existing hvac system and installation of new hvac system · 115 m away
- 5916 Birchbrook DrDec 22, 2020Repair sewer line · 177 m away
- 5010 Greenville AveJul 27, 2026New 5 ton split system · 200 m away
- 5030 Greenville Ave · 5030 Greenville Ave, LLCJun 27, 2025Interior remodeling the subcontract agreement covers the furnishing of tools, equipment, materials, supplies, engineering, scaffolding, incidentals, labor, supervision, cleaning, services, insurance, warranties, testing, and/or any other act or thing required to diligently and fully perform and complete the portions of work described herein. 2. in addition to the foregoing, it is further understood and agreed that this subcontract agreement also includes, but is not limited to, the following conditions and items, regardless of whether or not they are in listed contract documents. the items listed below are not intended to represent each and every item necessary to perform the work. 3. all deviations from or discrepancies to the contract documents must be brought to the immediate attention of the contractor in writing with sufficient details, references, and explanations to permit proper analysis. suggested solutions or substitutions shall accompany the notification whenever possible. 4. all work shall meet or exceed any and all applicable local, city, state, or federal codes and guidelines. 5. the subcontractor shall set up, arrange, coordinate, and obtain all inspections for its work as required by any authorized agency or applicable code. arrangements for the inspection of any area, system, equipment, etc., that are in need of testing or inspection prior to being covered up must be made by the subcontractor in sufficient time to allow for inspections so as not to impact the project schedule. in the event of low or substandard test results, the subcontractor shall be responsible for all costs involved in retesting of the materials/work in question and the replacement of inadequate materials/work. 6. subcontractor is responsible for providing certifications and licensing as required. 7. subcontractor is responsible for all fees 8. subcontractor is responsible for taxes 9. subcontractor shall provide competent personnel supervision at all times while on site and during your contracted trade inspections ($250.00 associated fee for each absence). 10. contractor shall provide general building permit. all other permits or special permits, fees, and licenses for subcontractor's work are included in subcontractor's scope. 11. subcontractor is responsible for layout required to perform subcontractor's scope of work. it shall also be the responsibility of the subcontractor to maintain and preserve all stakes and other control established by contractor or owner. if control or stakes are destroyed by subcontractor, they will be replaced at subcontractor's expense. 12. any cutting, core-drilling, access, cleanup, patching, repair, filling, disposal, etc. as required to install subcontractor's work is included in this scope of work. 13. subcontractor shall comply with contractor's safety standards / osha guidelines. contractor will correct unaddressed life- threatening safety issues at subcontractor's expense without written notice. 14. subcontractor is responsible for daily cleanup of its work. 15. subcontractor is responsible for the safety, security, and protection of its work, tools, equipment, and materials. 16. demolition (if applicable) will be done in a professional manner in accordance with industry standards. salvage all materials as indicated to be either stored or reused as required per subcontractor's scope of work. 17. each subcontractor will be responsible for sealing penetrations through walls, slabs, floor, and roofs so as to make water- tight, acoustically sealed, security proof as required, and/or to maintain the applicable smoke or fire ratings. 18. each subcontractor is responsible for placement of his embeds, sleeves, blockouts, and penetrations in walls, slabs, beams in accordance with the contract documents, with special attention to be paid to structural requirements. – as applicable · 213 m away
- 5807 E University BlvdDec 1, 2025Replace all 100 amp main disconnects and house panelbuilding afirst floor second flooraddress # meter # address # meter #5807 a 141625198 5807 c 1616280725807 b 1548617065811 a 143763296 5811 c 1561725275811 b 113055289 5811 d 162028530hlp-124543454 · 216 m away
- 4930 Greenville AveJul 27, 2026Oncor's drop and one of the feeders were damaged by a garbage truck. service needs to be disconnected for repair, but oncor requires the meter base to be relocated to the exterior of the building.we are installing a new 320-amp meter base and a new 400-amp fusible disconnect on the exterior, installing new parallel feeders, and reworking grounds to the new first means of disconnect · 217 m away
- 4914 Greenville AveMay 4, 2026Gas test · 217 m away
- 5815 E University BlvdDec 1, 2025Building bfirst floor second flooraddress # meter# address # meter #5815 a 113055277 5815 c 1558769115815 b 141620541 5815 d 134072333hlp-134433676 · 217 m away
- 4912 Greenville AveMar 19, 2026Install 2 3-ton package units, install all ductwork, install drain lines, install exhaust fans in restrooms · 218 m away