3511 Cullen Blvd
Houston, TX 77004 · University Of Houston
University of Houston lecture hall renovation at 3511 Cullen Blvd
A 3,881-square-foot existing lecture hall at the University of Houston is being renovated, according to a TDLR registration filed January 28, 2025. The scope includes new furniture and finishes, plus lighting, power, fire protection, and HVAC upgrades. The applicant estimated the project cost at $1.1 million; the registration lists its status as inspection complete.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 28, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jan 28, 2025
- since Jan 28, 2025
- Largest scope
- 3,881 sf
- Estimated cost
- $1.1M
- state registration
Where this project stands
Inspected · closing outUniversity of Houston Social Work 102 Renovation
3,881 sq ft · $1.1M est.
- RegisteredJan 28, 2025
- Plan review
- ConstructionFeb '25 – Oct '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRenovation of an existing lecture hall which includes furniture, finishes, lighting, power, fire protection, and hvac upgrades. — graduate school of social work
TDLR project registrationRenovation/AlterationInspection Complete3,881 sq ft$1.1M est.- Project #
- TABS2025010565
- Tenant / owner
- University Of Houston Social Work 102 Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3511 Cullen Blvd
What is being renovated at 3511 Cullen Blvd?
A 3,881-square-foot existing lecture hall for the University of Houston Graduate School of Social Work is being renovated. The work includes furniture, finishes, lighting, power, fire protection, and HVAC upgrades.
When was the University of Houston lecture hall renovation permitted?
The TDLR project registration was filed on January 28, 2025. It is listed as inspection complete.
What is the permit number for 3511 Cullen Blvd?
The TDLR registration number is TABS2025010565, filed January 28, 2025.
How much will the 3511 Cullen Blvd renovation cost?
The applicant estimated the project cost at $1.1 million in the TDLR registration.
What's being renovated near the University of Houston at 3507 Cullen Blvd?
A lecture hall at 3511 Cullen Blvd is being renovated for the University of Houston Graduate School of Social Work. The address is listed 5 meters from the University of Houston landmark at 3507 Cullen Blvd.
Is a new building going up at 3511 Cullen Blvd?
The filing describes renovation of an existing lecture hall, not new construction. The registered work covers 3,881 square feet.
Also being built nearby
All of 77004- 3507 Cullen Blvd · University Of HoustonJul 19, 2024Uh sr1 lab 302 renovation — renovation/alteration — renovation of existing lab space · 5 m away
- 3553 Cullen Blvd · University Of HoustonAug 8, 2025University of houston agnes arnold hall — renovation/alteration — the scope of work includes core infrastructure relating to mechanical, electrical, plumbing, finish upgrades, furniture and exterior facade repair / replacement. it is noted that conditions required by law to make the building accessible per tas or d · 47 m away
- 3455 Cullen Blvd · University Of HoustonApr 14, 2026Fy26 classroom refresh design science & research 2 building #551 — renovation/alteration — refresh of existing classroom 128 & 129 · 86 m away
- 3875 Holman Street · University Of HoustonMay 22, 2026Univ of houston - garrison g202 reno — renovation/alteration — interior remodel of an existing lecture hall. new finishes, replace seating, ceiling and lighting updates, paint, flooring, fire protection, and hvac upgrades · 160 m away
- 3871 Holman St · University Of HoustonMay 20, 2026Uh ehs melcher life science renovation — renovation/alteration — renovation of existing space into new office space · 165 m away
- 3700 Cullen Blvd · University Of HoustonFeb 20, 2024Uh football operations center — additions to existing building — this project is a new football operations center for the uh football team. the building contains locker rooms, meeting rooms, sports medicine, sports performance, administrative, and academic areas. there is also a club and premium suites · 172 m away
- 3623 Cullen Blvd · University Of HoustonMar 1, 2024University of houston core building renovation design services - charles f. mcelhinney — renovation/alteration — mcelhinney hall - core infrastructure mepf upgrades & repairing conditions required to make building accessible per tx access standards. full gut of 2nd & 3rd floors. 1st floor renovation of the public spaces/corridors along with flooring adjustment · 220 m away
- 3731 Cullen Blvd · University Of HoustonAug 8, 2025University of houston centennial hall — new construction — six story building. site work, foundation, sidewalks, utilities, mept equipment, superstructure, envelope, and interior work. site area 230,000.00 sq ft total building construction 242,908 sq ft · 276 m away
- 3402 Scott StApr 27, 2018700 sq ft restaurant build-out 100% · 455 m away
- 3432 Scott StNov 1, 2021Remodel 2,761 sq ft office lease · 457 m away
- 3719 Elgin St GaragJul 6, 2021137317 sq ft 4-story podium/garage sp/ (14/14) · 469 m away
- 3719 Elgin StJun 6, 2022Apartment amenity pool on the 5th floor · 469 m away