3700 Cullen Blvd
Houston, TX 77204 · University Of Houston
UH football operations center planned at 3700 Cullen Blvd
A 201,622-square-foot football operations center for the University of Houston is planned at 3700 Cullen Blvd. The TDLR project registration was filed February 20, 2024, and describes additions to an existing building.
Summarized from Texas Department of Licensing and Regulation records · updated Feb 20, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Feb 20, 2024
- since Feb 20, 2024
- Largest scope
- 201,622 sf
- Estimated cost
- $105M
- state registration
Where this project stands
CompletedUH Football Operations Center
201,622 sq ft · $105M est.
- RegisteredFeb 20, 2024
- Plan review
- ConstructionNov '23 – Jul '25
- Inspected
- Closed
Ran as a 20-month build.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectThis project is a new football operations center for the uh football team. the building contains locker rooms, meeting rooms, sports medicine, sports performance, administrative, and academic areas. there is also a club and premium suites. — uh football operations center
TDLR project registrationAdditions to Existing BuildingProject Closed201,622 sq ft$105M est.- Project #
- TABS2024011945
- Tenant / owner
- UH Football Operations Center
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3700 Cullen Blvd
What is being built at 3700 Cullen Blvd in Houston?
A new football operations center for the University of Houston is planned there. The TDLR registration lists locker rooms, meeting rooms, sports medicine and performance areas, administrative and academic areas, a club, and premium suites.
When was the UH Football Operations Center filed?
The TDLR project registration was filed February 20, 2024. Its project number is TABS2024011945.
How large is the UH Football Operations Center?
The TDLR registration lists the project at 201,622 square feet.
How much will the UH Football Operations Center cost?
The applicant's TDLR estimate for the project is $105 million.
What facilities are planned for the UH football operations center?
The project description lists locker rooms, meeting rooms, sports medicine and sports performance areas, administrative and academic spaces, a club, and premium suites.
Is the football operations center near the University of Houston?
Yes. The project is at 3700 Cullen Blvd, about 50 meters from the University of Houston at 3623 Cullen Blvd.
Also being built nearby
All of 77204- 3623 Cullen Blvd · University Of HoustonMar 1, 2024University of houston core building renovation design services - charles f. mcelhinney — renovation/alteration — mcelhinney hall - core infrastructure mepf upgrades & repairing conditions required to make building accessible per tx access standards. full gut of 2nd & 3rd floors. 1st floor renovation of the public spaces/corridors along with flooring adjustment · 50 m away
- 3731 Cullen Blvd · University Of HoustonAug 8, 2025University of houston centennial hall — new construction — six story building. site work, foundation, sidewalks, utilities, mept equipment, superstructure, envelope, and interior work. site area 230,000.00 sq ft total building construction 242,908 sq ft · 106 m away
- 3553 Cullen Blvd · University Of HoustonAug 8, 2025University of houston agnes arnold hall — renovation/alteration — the scope of work includes core infrastructure relating to mechanical, electrical, plumbing, finish upgrades, furniture and exterior facade repair / replacement. it is noted that conditions required by law to make the building accessible per tas or d · 125 m away
- 3511 Cullen Blvd · University Of HoustonJan 28, 2025University of houston social work 102 renovation — renovation/alteration — renovation of an existing lecture hall which includes furniture, finishes, lighting, power, fire protection, and hvac upgrades · 172 m away
- 3507 Cullen Blvd · University Of HoustonJul 19, 2024Uh sr1 lab 302 renovation — renovation/alteration — renovation of existing lab space · 176 m away
- 3875 Holman Street · University Of HoustonMay 22, 2026Univ of houston - garrison g202 reno — renovation/alteration — interior remodel of an existing lecture hall. new finishes, replace seating, ceiling and lighting updates, paint, flooring, fire protection, and hvac upgrades · 245 m away
- 3871 Holman St · University Of HoustonMay 20, 2026Uh ehs melcher life science renovation — renovation/alteration — renovation of existing space into new office space · 248 m away
- 3455 Cullen Blvd · University Of HoustonApr 14, 2026Fy26 classroom refresh design science & research 2 building #551 — renovation/alteration — refresh of existing classroom 128 & 129 · 258 m away
- 3602 Scott StDec 16, 2019(epr)5,600 sq ft new restaurant with sitework · 437 m away
- 4277 Wheeler Ave · University Of HoustonMar 28, 2025Cougar woods dining commons remodel — renovation/alteration — interior renovation of an existing dining hall. no changes to parking requirements. the scope consists of new finishes, new lighting, new furniture as noted, new ceiling acoustic treatment, and updates to electrical as required for new lighting · 456 m away
- 3517 Adair StFeb 6, 2025Residential plumbing application · 476 m away
- 3432 Scott StNov 1, 2021Remodel 2,761 sq ft office lease · 493 m away