3623 Cullen Blvd
Houston, TX 77004 · University Of Houston
McElhinney Hall renovation filed at University of Houston
A renovation of Charles F. McElhinney Hall at 3623 Cullen Blvd was registered with the Texas Department of Licensing and Regulation on March 1, 2024. The 70,753-square-foot project includes core infrastructure upgrades, accessibility work, a full renovation of the second and third floors, and updates to first-floor public spaces and corridors.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 1, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 1, 2024
- since Mar 1, 2024
- Largest scope
- 70,753 sf
- Estimated cost
- $29M
- state registration
Where this project stands
Inspected · closing outUniversity of Houston Core Building Renovation Design Services - Charles F. McElhinney
70,753 sq ft · $29M est.
- RegisteredMar 1, 2024
- Plan review
- ConstructionMay '24 – Nov '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectMcelhinney hall - core infrastructure mepf upgrades & repairing conditions required to make building accessible per tx access standards. full gut of 2nd & 3rd floors. 1st floor renovation of the public spaces/corridors along with flooring adjustment. — university of houston charles f. mcelhinney hall
TDLR project registrationRenovation/AlterationInspection Complete70,753 sq ft$29M est.- Project #
- TABS2024012880
- Tenant / owner
- University Of Houston Core Building Renovation Design Services - Charles F. Mcelhinney
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3623 Cullen Blvd
What is being built at 3623 Cullen Blvd in Houston?
The project is a renovation of Charles F. McElhinney Hall at the University of Houston, not a new building. The TDLR registration lists infrastructure and accessibility upgrades and renovations to multiple floors.
When was the McElhinney Hall renovation filed?
The TDLR project registration was filed March 1, 2024. The project is listed as inspection complete.
What work is planned for McElhinney Hall?
The scope includes mechanical, electrical, plumbing and fire protection upgrades, accessibility work, a full gut renovation of the second and third floors, and first-floor public-space and corridor renovations.
How large is the McElhinney Hall renovation?
The TDLR registration lists the project at 70,753 square feet.
What is the estimated cost of the McElhinney Hall project?
The applicant's TDLR estimate for the project is $29,343,502.
What's happening near the University of Houston at 3700 Cullen Blvd?
At 3623 Cullen Blvd, the University of Houston registered a renovation of Charles F. McElhinney Hall on March 1, 2024. A separate project record at 3700 Cullen Blvd describes a football operations center addition.
Also being built nearby
All of 77004- 3700 Cullen Blvd · University Of HoustonFeb 20, 2024Uh football operations center — additions to existing building — this project is a new football operations center for the uh football team. the building contains locker rooms, meeting rooms, sports medicine, sports performance, administrative, and academic areas. there is also a club and premium suites · 50 m away
- 3731 Cullen Blvd · University Of HoustonAug 8, 2025University of houston centennial hall — new construction — six story building. site work, foundation, sidewalks, utilities, mept equipment, superstructure, envelope, and interior work. site area 230,000.00 sq ft total building construction 242,908 sq ft · 57 m away
- 3553 Cullen Blvd · University Of HoustonAug 8, 2025University of houston agnes arnold hall — renovation/alteration — the scope of work includes core infrastructure relating to mechanical, electrical, plumbing, finish upgrades, furniture and exterior facade repair / replacement. it is noted that conditions required by law to make the building accessible per tas or d · 172 m away
- 3511 Cullen Blvd · University Of HoustonJan 28, 2025University of houston social work 102 renovation — renovation/alteration — renovation of an existing lecture hall which includes furniture, finishes, lighting, power, fire protection, and hvac upgrades · 220 m away
- 3507 Cullen Blvd · University Of HoustonJul 19, 2024Uh sr1 lab 302 renovation — renovation/alteration — renovation of existing lab space · 224 m away
- 3875 Holman Street · University Of HoustonMay 22, 2026Univ of houston - garrison g202 reno — renovation/alteration — interior remodel of an existing lecture hall. new finishes, replace seating, ceiling and lighting updates, paint, flooring, fire protection, and hvac upgrades · 292 m away
- 3871 Holman St · University Of HoustonMay 20, 2026Uh ehs melcher life science renovation — renovation/alteration — renovation of existing space into new office space · 295 m away
- 3455 Cullen Blvd · University Of HoustonApr 14, 2026Fy26 classroom refresh design science & research 2 building #551 — renovation/alteration — refresh of existing classroom 128 & 129 · 306 m away
- 4277 Wheeler Ave · University Of HoustonMar 28, 2025Cougar woods dining commons remodel — renovation/alteration — interior renovation of an existing dining hall. no changes to parking requirements. the scope consists of new finishes, new lighting, new furniture as noted, new ceiling acoustic treatment, and updates to electrical as required for new lighting · 407 m away
- 3602 Scott StDec 16, 2019(epr)5,600 sq ft new restaurant with sitework · 456 m away
- 4414 Rockwood DrSep 29, 2017Residential remodel · 455 m away
- 4444 Cullen BlvdAug 22, 2022Apartment foundation repair as per plan - buiding #1 · 464 m away