3507 Cullen Blvd
Houston, TX 77204 · University Of Houston
UH lab renovation registered at 3507 Cullen Blvd
A 457-square-foot renovation of existing University of Houston lab space was registered on July 19, 2024. The TDLR record lists an estimated project cost of $500,000 and marks the project closed.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 19, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jul 19, 2024
- since Jul 19, 2024
- Largest scope
- 457 sf
- Estimated cost
- $500K
- state registration
Where this project stands
CompletedUH SR1 Lab 302 Renovation
457 sq ft · $500K est.
- RegisteredJul 19, 2024
- Plan review
- ConstructionSep '24 – May '25
- Inspected
- Closed
Ran as a 9-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRenovation of existing lab space. — university of houston
TDLR project registrationRenovation/AlterationProject Closed457 sq ft$500K est.- Project #
- TABS2024023415
- Tenant / owner
- UH Sr1 Lab 302 Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3507 Cullen Blvd
What is being built at 3507 Cullen Blvd in Houston?
The University of Houston registered a renovation of existing lab space, not a new building. The project covers 457 square feet.
When was the lab renovation at 3507 Cullen Blvd permitted?
The TDLR project registration was filed on July 19, 2024. Its registration number is TABS2024023415.
How much will the University of Houston lab renovation cost?
The TDLR record lists an applicant-estimated project cost of $500,000.
Is the project at 3507 Cullen Blvd still active?
The TDLR record marks the project closed.
What's being renovated near the University of Houston on Cullen Blvd?
A 457-square-foot space identified as UH SR1 Lab 302 is being renovated. The University of Houston is listed nearby at 3511 Cullen Blvd.
Is a new lab building going up at 3507 Cullen Blvd?
The record describes a renovation of existing lab space, not new construction.
Also being built nearby
All of 77204- 3511 Cullen Blvd · University Of HoustonJan 28, 2025University of houston social work 102 renovation — renovation/alteration — renovation of an existing lecture hall which includes furniture, finishes, lighting, power, fire protection, and hvac upgrades · 5 m away
- 3553 Cullen Blvd · University Of HoustonAug 8, 2025University of houston agnes arnold hall — renovation/alteration — the scope of work includes core infrastructure relating to mechanical, electrical, plumbing, finish upgrades, furniture and exterior facade repair / replacement. it is noted that conditions required by law to make the building accessible per tas or d · 52 m away
- 3455 Cullen Blvd · University Of HoustonApr 14, 2026Fy26 classroom refresh design science & research 2 building #551 — renovation/alteration — refresh of existing classroom 128 & 129 · 81 m away
- 3875 Holman Street · University Of HoustonMay 22, 2026Univ of houston - garrison g202 reno — renovation/alteration — interior remodel of an existing lecture hall. new finishes, replace seating, ceiling and lighting updates, paint, flooring, fire protection, and hvac upgrades · 159 m away
- 3871 Holman St · University Of HoustonMay 20, 2026Uh ehs melcher life science renovation — renovation/alteration — renovation of existing space into new office space · 164 m away
- 3700 Cullen Blvd · University Of HoustonFeb 20, 2024Uh football operations center — additions to existing building — this project is a new football operations center for the uh football team. the building contains locker rooms, meeting rooms, sports medicine, sports performance, administrative, and academic areas. there is also a club and premium suites · 176 m away
- 3623 Cullen Blvd · University Of HoustonMar 1, 2024University of houston core building renovation design services - charles f. mcelhinney — renovation/alteration — mcelhinney hall - core infrastructure mepf upgrades & repairing conditions required to make building accessible per tx access standards. full gut of 2nd & 3rd floors. 1st floor renovation of the public spaces/corridors along with flooring adjustment · 224 m away
- 3731 Cullen Blvd · University Of HoustonAug 8, 2025University of houston centennial hall — new construction — six story building. site work, foundation, sidewalks, utilities, mept equipment, superstructure, envelope, and interior work. site area 230,000.00 sq ft total building construction 242,908 sq ft · 281 m away
- 3402 Scott StApr 27, 2018700 sq ft restaurant build-out 100% · 454 m away
- 3432 Scott StNov 1, 2021Remodel 2,761 sq ft office lease · 456 m away
- 3719 Elgin St GaragJul 6, 2021137317 sq ft 4-story podium/garage sp/ (14/14) · 465 m away
- 3719 Elgin StJun 6, 2022Apartment amenity pool on the 5th floor · 465 m away