3455 Cullen Blvd
Houston, TX 77204 · University Of Houston
Classroom refresh planned at University of Houston
A 1,480-square-foot refresh of existing classrooms 128 and 129 in the Design Science & Research 2 Building is planned at the University of Houston. A TDLR project registration was filed April 14, 2026; it lists an estimated project cost of $300,000.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 14, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 14, 2026
- since Apr 14, 2026
- Largest scope
- 1,480 sf
- Estimated cost
- $300K
- state registration
Where this project stands
Under constructionFY26 Classroom Refresh Design Science & Research 2 Bldg #551
1,480 sq ft · $300K est.
- RegisteredApr 14, 2026
- Plan review
- ConstructionMay '26 – Jan '27
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRefresh of existing classroom 128 & 129 — university of houston
TDLR project registrationRenovation/AlterationReview Complete1,480 sq ft$300K est.- Project #
- TABS2026017569
- Tenant / owner
- Fy26 Classroom Refresh Design Science & Research 2 Bldg #551
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3455 Cullen Blvd
What is being built at 3455 Cullen Blvd?
The project is a refresh of existing classrooms 128 and 129 in the Design Science & Research 2 Building at the University of Houston. The TDLR registration describes a 1,480-square-foot renovation.
When was the classroom refresh filed?
The TDLR project registration was filed April 14, 2026. Its number is TABS2026017569.
How much will the Design Science & Research 2 classroom project cost?
The TDLR registration lists an estimated project cost of $300,000. This is the applicant's estimate for the project.
Is a new building planned at 3455 Cullen Blvd?
The registration describes a renovation or alteration to existing classrooms 128 and 129, not construction of a new building.
What's being renovated near Univ Of Houston - Garrison G202 Reno?
A 1,480-square-foot refresh of existing classrooms 128 and 129 is registered at 3455 Cullen Blvd, about 171 meters from Univ Of Houston - Garrison G202 Reno. The filing date is April 14, 2026.
What is happening near UH Ehs Melcher Life Science Renovation?
The University of Houston's Design Science & Research 2 Building is slated for a refresh of existing classrooms 128 and 129. The TDLR registration was filed April 14, 2026, about 176 meters from UH Ehs Melcher Life Science Renovation.
Also being built nearby
All of 77204- 3507 Cullen Blvd · University Of HoustonJul 19, 2024Uh sr1 lab 302 renovation — renovation/alteration — renovation of existing lab space · 81 m away
- 3511 Cullen Blvd · University Of HoustonJan 28, 2025University of houston social work 102 renovation — renovation/alteration — renovation of an existing lecture hall which includes furniture, finishes, lighting, power, fire protection, and hvac upgrades · 86 m away
- 3553 Cullen Blvd · University Of HoustonAug 8, 2025University of houston agnes arnold hall — renovation/alteration — the scope of work includes core infrastructure relating to mechanical, electrical, plumbing, finish upgrades, furniture and exterior facade repair / replacement. it is noted that conditions required by law to make the building accessible per tas or d · 133 m away
- 3875 Holman Street · University Of HoustonMay 22, 2026Univ of houston - garrison g202 reno — renovation/alteration — interior remodel of an existing lecture hall. new finishes, replace seating, ceiling and lighting updates, paint, flooring, fire protection, and hvac upgrades · 171 m away
- 3871 Holman St · University Of HoustonMay 20, 2026Uh ehs melcher life science renovation — renovation/alteration — renovation of existing space into new office space · 176 m away
- 3700 Cullen Blvd · University Of HoustonFeb 20, 2024Uh football operations center — additions to existing building — this project is a new football operations center for the uh football team. the building contains locker rooms, meeting rooms, sports medicine, sports performance, administrative, and academic areas. there is also a club and premium suites · 258 m away
- 3623 Cullen Blvd · University Of HoustonMar 1, 2024University of houston core building renovation design services - charles f. mcelhinney — renovation/alteration — mcelhinney hall - core infrastructure mepf upgrades & repairing conditions required to make building accessible per tx access standards. full gut of 2nd & 3rd floors. 1st floor renovation of the public spaces/corridors along with flooring adjustment · 306 m away
- 3731 Cullen Blvd · University Of HoustonAug 8, 2025University of houston centennial hall — new construction — six story building. site work, foundation, sidewalks, utilities, mept equipment, superstructure, envelope, and interior work. site area 230,000.00 sq ft total building construction 242,908 sq ft · 362 m away
- 3719 Elgin St GaragJul 6, 2021137317 sq ft 4-story podium/garage sp/ (14/14) · 400 m away
- 3719 Elgin StJun 6, 2022Apartment amenity pool on the 5th floor · 400 m away
- 4005 Elgin StMay 7, 2019Menu boards, retail · 418 m away
- 4188 Elgin Street · University Of HoustonAug 20, 2024University of houston fine arts building room 130 — renovation/alteration — conversion of an existing organ recital hall into a lecture hall for the music department. includes removal of existing organ, replacement of all seating, ceiling & lighting updates, paint, flooring, fire protection and hvac upgrades · 431 m away