11905 Hornsby St
Austin, TX 78753
Drain system replacement permitted at 11905 Hornsby St
A plumbing permit indicates work to tunnel beneath the foundation and replace the entire drain system at 11905 Hornsby St. The City of Austin permit was filed on October 21, 2025, and is marked final.
Summarized from City of Austin records · updated Oct 21, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 21, 2025
- since Oct 21, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled105 tunnel below the foundation to replace entire drain system. 3 access holes - back back right
- AppliedOct 1, 2025
- IssuedOct 21, 2025
- WorkOct '25 – Nov '25
- Final inspectionNov 13, 2025
Passed final inspection Nov 13, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 project105 tunnel below the foundation to replace entire drain system. 3 access holes - back back right
105 tunnel below the foundation to replace entire drain system. 3 access holes - back back right
City of Austin permitPlumbing PermitFinal- Record
- 2025-125126 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11905 Hornsby St
What work is permitted at 11905 Hornsby St?
A City of Austin plumbing permit indicates tunneling beneath the foundation to replace the entire drain system. It also mentions three access holes.
When was the plumbing permit filed for 11905 Hornsby St?
The City of Austin filed permit 2025-125126 PP on October 21, 2025.
Is 11905 Hornsby St getting a new building?
The available record is for plumbing work to replace the drain system, not for construction of a new building.
What is the status of permit 2025-125126 PP?
The City of Austin lists the plumbing permit as final.
How many access holes are included in the 11905 Hornsby St permit?
The permit description mentions three access holes as part of the drain system replacement work.
Also being built nearby
All of 78753- 11902 Rennalee LoopNov 8, 2025Replaced sewer piping under home · 46 m away
- 11908 Hornsby StJan 8, 2026(kahlert patrick) - installation of circuit for elec. vehicle charging station - esip) · 66 m away
- 11902 Hornsby StFeb 20, 2019Spanish oak ridge annex ii resubdivision of lots a&b · 68 m away
- 11901 Hornsby StJun 12, 2024Install level 2 ev charger per austin energys plug-in rebate guidelines · 72 m away
- 11916 Rennalee LoopJul 30, 2025Tunnel about 10 ft in from the front of the house to replace the cast iron below floor waste and vent piping with new pvc piping. tunnel about 10 ft in the rear of the house to the rear restroom for a similar repipe. this rear piping will run around the house and connect to the front bathroom yard line. the kitchen sink will also stub out the rear and connect to the rear bathroom piping. we will access this piping within the kitchen cabinet. the washer line will run thru the garage to the front line. we will demolition concrete thru the garage to accomplish this · 88 m away
- 11913 Hornsby StJan 9, 2025Replace the underfloor sanitary sewer piping for the clothes washer in the garage. this includes breaking concrete thru the garage and running the new piping diagonally across the front yard and connecting to the sewer yard line · 103 m away
- 11912 Hornsby StMay 14, 2025Installation of a level 2 ev charger in the garage · 104 m away
- 11915 Rennalee LoopMay 1, 2026Ev charger installation · 122 m away
- 11920 Rennalee LoopMar 29, 2024Replacement of complete existing central heat and air system with or without duct work · 133 m away
- 600 Jetta CtSep 3, 2024Replacement of complete existing central heat and air system with or without duct work · 137 m away
- 11807 Tedford StJun 5, 2025New pool spa and concrete patio · 147 m away
- 11802 Hornsby StJun 18, 2026Replace riser grounding and surge protection. like for like · 154 m away