11908 Hornsby St
Austin, TX 78753
EV charging circuit permitted at 11908 Hornsby St
Austin permits indicate electrical work for an electric-vehicle charging station at this home, filed January 8, 2026. Other permits cover a water-heater replacement and its electrical circuit, filed in September and October 2025. The listed permits are marked final.
Summarized from City of Austin records · updated Jan 8, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Jan 8, 2026
- since Sep 15, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled(kahlert patrick) - installation of circuit for elec. vehicle charging station - esip)
- AppliedJan 5, 2026
- IssuedJan 8, 2026
- WorkJan '26 – Feb '26
- Final inspectionFeb 3, 2026
Passed final inspection Feb 3, 2026.
1 contact on this project
Permit & project history
4 projects(kahlert patrick) - installation of circuit for elec. vehicle charging station - esip)
(kahlert patrick) - installation of circuit for elec. vehicle charging station - esip)
City of Austin permitElectrical PermitFinal- Record
- 2026-000846 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater heat pump wh
Replacement of an existing water heater heat pump wh
City of Austin permitPlumbing PermitFinal- Record
- 2025-115037 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install circuit for water heater
Install circuit for water heater
City of Austin permitElectrical PermitFinal- Record
- 2025-115064 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2023-054261 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11908 Hornsby St
What is happening at 11908 Hornsby St in Austin?
City of Austin permits document a circuit for an electric-vehicle charging station, along with water-heater work. The latest filing was permit 2026-000846 EP, dated January 8, 2026.
Is an EV charger being installed at 11908 Hornsby St?
The January 8, 2026 electrical permit describes installation of a circuit for an electric-vehicle charging station. It does not specify the charger itself.
When was the EV charging work permitted at 11908 Hornsby St?
The City of Austin filed electrical permit 2026-000846 EP on January 8, 2026. Its status is final.
What water-heater work was permitted at 11908 Hornsby St?
A plumbing permit dated October 1, 2025, describes replacement of an existing water heater. Electrical permit 2025-115064 EP, filed September 15, 2025, covers a circuit for the water heater.
Is a new home being built at 11908 Hornsby St?
The listed City of Austin records describe electrical, plumbing, and mechanical work at the address, including a water-heater replacement and an electric-vehicle charging circuit. They do not list a new-home construction permit.
What other recent permits are listed for 11908 Hornsby St?
A May 11, 2023 mechanical permit, 2023-054261 MP, describes replacement of the existing central heating and air system. The 2025 permits cover water-heater work, and the 2026 permit covers an EV-charging circuit.
Also being built nearby
All of 78753- 11912 Hornsby StMay 14, 2025Installation of a level 2 ev charger in the garage · 43 m away
- 11905 Hornsby StOct 21, 2025105 tunnel below the foundation to replace entire drain system. 3 access holes - back back right · 66 m away
- 11913 Hornsby StJan 9, 2025Replace the underfloor sanitary sewer piping for the clothes washer in the garage. this includes breaking concrete thru the garage and running the new piping diagonally across the front yard and connecting to the sewer yard line · 70 m away
- 11916 Rennalee LoopJul 30, 2025Tunnel about 10 ft in from the front of the house to replace the cast iron below floor waste and vent piping with new pvc piping. tunnel about 10 ft in the rear of the house to the rear restroom for a similar repipe. this rear piping will run around the house and connect to the front bathroom yard line. the kitchen sink will also stub out the rear and connect to the rear bathroom piping. we will access this piping within the kitchen cabinet. the washer line will run thru the garage to the front line. we will demolition concrete thru the garage to accomplish this · 92 m away
- 11902 Hornsby StFeb 20, 2019Spanish oak ridge annex ii resubdivision of lots a&b · 97 m away
- 11902 Rennalee LoopNov 8, 2025Replaced sewer piping under home · 99 m away
- 600 Jetta CtSep 3, 2024Replacement of complete existing central heat and air system with or without duct work · 102 m away
- 11920 Rennalee LoopMar 29, 2024Replacement of complete existing central heat and air system with or without duct work · 118 m away
- 11904 Tedford StNov 24, 2025New irrigation installation · 126 m away
- 11901 Hornsby StJun 12, 2024Install level 2 ev charger per austin energys plug-in rebate guidelines · 130 m away
- 11915 Rennalee LoopMay 1, 2026Ev charger installation · 146 m away
- 11812 Tedford StSep 27, 2024*partial demolition* addition/remodel - addition of covered patio and enlarged garage space. adding conditioned bath and closet to existing garage space. roof and framing to be repaired/remodeled · 154 m away