11920 Rennalee Loop
Austin, TX 78753
11920 Rennalee Loop: 1 project on record
City of Austin lists 1 filing across 1 project at 11920 Rennalee Loop, Austin, TX 78753. The most recent, filed March 29, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Mar 29, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 29, 2024
- since Mar 29, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplacement of complete existing central heat and air system with or without duct work
- AppliedMar 25, 2024
- IssuedMar 29, 2024
- !WorkMar '24 – Apr '25
- Final inspection
Marked expired Apr 11, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitExpired- Record
- 2024-036723 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11920 Rennalee Loop
What is being built at 11920 Rennalee Loop?
The latest filing (City of Austin permit 2024-036723 MP, March 29, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 11920 Rennalee Loop have?
1 filing across 1 project, from March 29, 2024 to March 29, 2024.
Is there other construction near 11920 Rennalee Loop?
Yes. Nearby filings include 11916 Rennalee Loop (tunnel about 10 ft in from the front of the house to replace the cast iron below floor waste and vent piping with new pvc piping. tunnel about 10 ft in the rear of the house to the rear restroom for a similar repipe. this rear piping will run around the house and connect to the front bathroom yard line. the kitchen sink will also stub out the rear and connect to the rear bathroom piping. we will access this piping within the kitchen cabinet. the washer line will run thru the garage to the front line. we will demolition concrete thru the garage to accomplish this, Jul 30, 2025); 11913 Hornsby St (replace the underfloor sanitary sewer piping for the clothes washer in the garage. this includes breaking concrete thru the garage and running the new piping diagonally across the front yard and connecting to the sewer yard line, Jan 9, 2025); 11915 Rennalee Loop (ev charger installation, May 1, 2026).
How do I get alerts for new permits at 11920 Rennalee Loop?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 11916 Rennalee LoopJul 30, 2025Tunnel about 10 ft in from the front of the house to replace the cast iron below floor waste and vent piping with new pvc piping. tunnel about 10 ft in the rear of the house to the rear restroom for a similar repipe. this rear piping will run around the house and connect to the front bathroom yard line. the kitchen sink will also stub out the rear and connect to the rear bathroom piping. we will access this piping within the kitchen cabinet. the washer line will run thru the garage to the front line. we will demolition concrete thru the garage to accomplish this · 50 m away
- 11913 Hornsby StJan 9, 2025Replace the underfloor sanitary sewer piping for the clothes washer in the garage. this includes breaking concrete thru the garage and running the new piping diagonally across the front yard and connecting to the sewer yard line · 52 m away
- 11915 Rennalee LoopMay 1, 2026Ev charger installation · 78 m away
- 301 Cedarbrook CtSep 26, 2024Replacement of complete existing central heat and air system with or without duct work · 100 m away
- 11912 Hornsby StMay 14, 2025Installation of a level 2 ev charger in the garage · 100 m away
- 11902 Rennalee LoopNov 8, 2025Replaced sewer piping under home · 117 m away
- 11908 Hornsby StJan 8, 2026(kahlert patrick) - installation of circuit for elec. vehicle charging station - esip) · 118 m away
- 11905 Hornsby StOct 21, 2025105 tunnel below the foundation to replace entire drain system. 3 access holes - back back right · 133 m away
- 11928 Oakbrook DrJul 16, 2024Demolition existing meter and install new 150 amp main breaker up to code meter service · 134 m away
- 306 Cedarbrook CtMar 21, 2024Cap off w&ww · 135 m away
- 304 Cedarbrook CtDec 5, 2023Cap off water/wastewater lines for residential demolitions · 144 m away
- 11924 Oakbrook DrJul 31, 2024Replacement of complete existing central heat and air system with or without duct work · 150 m away