11928 Oakbrook Dr
Austin, TX 78753
11928 Oakbrook Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 11928 Oakbrook Dr, Austin, TX 78753. The most recent, filed July 16, 2024, covers: “Demolition existing meter and install new 150 amp main breaker up to code meter service”.
Compiled from City of Austin records · updated Jul 16, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jul 16, 2024
- since Jul 16, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledDemolition existing meter and install new 150 amp main breaker up to code meter service
- AppliedJul 8, 2024
- IssuedJul 16, 2024
- WorkJul '24 – Jul '24
- Final inspectionJul 30, 2024
Passed final inspection Jul 30, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectDemolition existing meter and install new 150 amp main breaker up to code meter service
Demolition existing meter and install new 150 amp main breaker up to code meter service
City of Austin permitElectrical PermitFinal- Record
- 2024-084383 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11928 Oakbrook Dr
What is being built at 11928 Oakbrook Dr?
The latest filing (City of Austin permit 2024-084383 EP, July 16, 2024) covers demolition existing meter and install new 150 amp main breaker up to code meter service.
How many permits and filings does 11928 Oakbrook Dr have?
1 filing across 1 project, from July 16, 2024 to July 16, 2024.
Is there other construction near 11928 Oakbrook Dr?
Yes. Nearby filings include 11924 Oakbrook Dr (replacement of complete existing central heat and air system with or without duct work, Jul 31, 2024); 306 Cedarbrook Ct (cap off w&ww, Mar 21, 2024); 11911 Tedford St (kinsey will tunnel under home approx 100ft we will remove old cast iron pipe and replace with pvc in its place. we will hang pipe by hanger every 6ft from slab. pictures will be taken and engineer report will be done on tunnel. yard sewer line will also be replaced with new schedule40 pvc bed in sand add cleanouts every 50ft, Mar 11, 2026).
How do I get alerts for new permits at 11928 Oakbrook Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 11924 Oakbrook DrJul 31, 2024Replacement of complete existing central heat and air system with or without duct work · 36 m away
- 306 Cedarbrook CtMar 21, 2024Cap off w&ww · 83 m away
- 11911 Tedford StMar 11, 2026Kinsey will tunnel under home approx 100ft we will remove old cast iron pipe and replace with pvc in its place. we will hang pipe by hanger every 6ft from slab. pictures will be taken and engineer report will be done on tunnel. yard sewer line will also be replaced with new schedule40 pvc bed in sand add cleanouts every 50ft · 84 m away
- 11920 Oakbrook DrJul 2, 2024Installation of 7.82kw solar pv and 27kwh energy storage system to residence · 88 m away
- 304 Cedarbrook CtDec 5, 2023Cap off water/wastewater lines for residential demolitions · 115 m away
- 11920 Rennalee LoopMar 29, 2024Replacement of complete existing central heat and air system with or without duct work · 134 m away
- 301 Cedarbrook CtSep 26, 2024Replacement of complete existing central heat and air system with or without duct work · 136 m away
- 11913 Hornsby StJan 9, 2025Replace the underfloor sanitary sewer piping for the clothes washer in the garage. this includes breaking concrete thru the garage and running the new piping diagonally across the front yard and connecting to the sewer yard line · 144 m away
- 11912 Hornsby StMay 14, 2025Installation of a level 2 ev charger in the garage · 160 m away
- 11904 Tedford StNov 24, 2025New irrigation installation · 171 m away
- 11916 Rennalee LoopJul 30, 2025Tunnel about 10 ft in from the front of the house to replace the cast iron below floor waste and vent piping with new pvc piping. tunnel about 10 ft in the rear of the house to the rear restroom for a similar repipe. this rear piping will run around the house and connect to the front bathroom yard line. the kitchen sink will also stub out the rear and connect to the rear bathroom piping. we will access this piping within the kitchen cabinet. the washer line will run thru the garage to the front line. we will demolition concrete thru the garage to accomplish this · 179 m away
- 11914 Oakbrook DrOct 29, 2024200 amp service upgrade · 181 m away
More demolitions in 78753.