304 Cedarbrook Ct
Austin, TX 78753
304 Cedarbrook Ct: 2 projects on record
City of Austin lists 2 filings across 2 projects at 304 Cedarbrook Ct, Austin, TX 78753. The most recent, filed December 5, 2023, covers: “Cap off water/wastewater lines for residential demolitions”.
Compiled from City of Austin records · updated Dec 5, 2023
- Projects
- 2
- 2 filings
- Latest filing
- Dec 5, 2023
- since Dec 5, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledCap off water/wastewater lines for residential demolitions
- AppliedNov 21, 2023
- IssuedDec 5, 2023
- WorkDec '23 – Dec '23
- Final inspectionDec 19, 2023
Passed final inspection Dec 19, 2023.
2 contacts on this project · 2 phone numbers
Permit & project history
2 projectsCap off water/wastewater lines for residential demolitions
Cap off water/wastewater lines for residential demolitions
City of Austin permitPlumbing PermitFinal- Record
- 2023-155084 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Total demolition of 1 story sfr 2250 sq ft circa 1970. ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage
Total demolition of 1 story sfr 2250 sq ft circa 1970. ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage
City of Austin permitBuilding PermitFinal- Record
- 2023-154261 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 304 Cedarbrook Ct
What is being built at 304 Cedarbrook Ct?
The latest filing (City of Austin permit 2023-155084 PP, December 5, 2023) covers cap off water/wastewater lines for residential demolitions.
How many permits and filings does 304 Cedarbrook Ct have?
2 filings across 2 projects, from December 5, 2023 to December 5, 2023.
Is there other construction near 304 Cedarbrook Ct?
Yes. Nearby filings include 306 Cedarbrook Ct (cap off w&ww, Mar 21, 2024); 301 Cedarbrook Ct (replacement of complete existing central heat and air system with or without duct work, Sep 26, 2024); 11928 Oakbrook Dr (demolition existing meter and install new 150 amp main breaker up to code meter service, Jul 16, 2024).
How do I get alerts for new permits at 304 Cedarbrook Ct?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 306 Cedarbrook CtMar 21, 2024Cap off w&ww · 32 m away
- 301 Cedarbrook CtSep 26, 2024Replacement of complete existing central heat and air system with or without duct work · 62 m away
- 11928 Oakbrook DrJul 16, 2024Demolition existing meter and install new 150 amp main breaker up to code meter service · 115 m away
- 11920 Rennalee LoopMar 29, 2024Replacement of complete existing central heat and air system with or without duct work · 144 m away
- 11924 Oakbrook DrJul 31, 2024Replacement of complete existing central heat and air system with or without duct work · 151 m away
- 11913 Hornsby StJan 9, 2025Replace the underfloor sanitary sewer piping for the clothes washer in the garage. this includes breaking concrete thru the garage and running the new piping diagonally across the front yard and connecting to the sewer yard line · 187 m away
- 11915 Rennalee LoopMay 1, 2026Ev charger installation · 187 m away
- 11916 Rennalee LoopJul 30, 2025Tunnel about 10 ft in from the front of the house to replace the cast iron below floor waste and vent piping with new pvc piping. tunnel about 10 ft in the rear of the house to the rear restroom for a similar repipe. this rear piping will run around the house and connect to the front bathroom yard line. the kitchen sink will also stub out the rear and connect to the rear bathroom piping. we will access this piping within the kitchen cabinet. the washer line will run thru the garage to the front line. we will demolition concrete thru the garage to accomplish this · 191 m away
- 11911 Tedford StMar 11, 2026Kinsey will tunnel under home approx 100ft we will remove old cast iron pipe and replace with pvc in its place. we will hang pipe by hanger every 6ft from slab. pictures will be taken and engineer report will be done on tunnel. yard sewer line will also be replaced with new schedule40 pvc bed in sand add cleanouts every 50ft · 196 m away
- 11920 Oakbrook DrJul 2, 2024Installation of 7.82kw solar pv and 27kwh energy storage system to residence · 203 m away
- 11912 Hornsby StMay 14, 2025Installation of a level 2 ev charger in the garage · 225 m away
- 11906 Indianhead DrAug 3, 2026Create entry tunnel(s) to replace all cast iron drain system up to bottom of foundation and out to exterior cleanout. approx 50ft of tunnel · 250 m away
More demolitions in 78753.