11912 Hornsby St
Austin, TX 78753
11912 Hornsby St: 5 projects on record
City of Austin lists 5 filings across 5 projects at 11912 Hornsby St, Austin, TX 78753 since June 27, 2024. The most recent, filed May 14, 2025, covers: “Installation of a level 2 ev charger in the garage”.
Compiled from City of Austin records · updated May 14, 2025
- Projects
- 5
- 5 filings
- Latest filing
- May 14, 2025
- since Jun 27, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstallation of a level 2 ev charger in the garage
- AppliedMay 9, 2025
- IssuedMay 14, 2025
- WorkMay '25 – Nov '25
- Final inspectionJun 11, 2025
Passed final inspection Jun 11, 2025.
1 contact on this project · 1 phone number
Permit & project history
5 projectsInstallation of a level 2 ev charger in the garage
Installation of a level 2 ev charger in the garage
City of Austin permitElectrical PermitFinal- Record
- 2025-057901 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-078529 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Abandon septic tank and connect sewer to the city tap
Abandon septic tank and connect sewer to the city tap
City of Austin permitPlumbing PermitFinal- Record
- 2023-052742 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install new 7.6kw rooftop solar system to existing residential only
Install new 7.6kw rooftop solar system to existing residential only
City of Austin permitElectrical PermitFinal- Record
- 2023-059051 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Disconnect/reconnect power for a full service upgrade
Disconnect/reconnect power for a full service upgrade
City of Austin permitElectrical PermitFinal- Record
- 2023-061315 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11912 Hornsby St
What is being built at 11912 Hornsby St?
The latest filing (City of Austin permit 2025-057901 EP, May 14, 2025) covers installation of a level 2 ev charger in the garage.
How many permits and filings does 11912 Hornsby St have?
5 filings across 5 projects, from June 27, 2024 to May 14, 2025.
Is there other construction near 11912 Hornsby St?
Yes. Nearby filings include 11908 Hornsby St ((kahlert patrick) - installation of circuit for elec. vehicle charging station - esip), Jan 8, 2026); 11913 Hornsby St (replace the underfloor sanitary sewer piping for the clothes washer in the garage. this includes breaking concrete thru the garage and running the new piping diagonally across the front yard and connecting to the sewer yard line, Jan 9, 2025); 11916 Rennalee Loop (tunnel about 10 ft in from the front of the house to replace the cast iron below floor waste and vent piping with new pvc piping. tunnel about 10 ft in the rear of the house to the rear restroom for a similar repipe. this rear piping will run around the house and connect to the front bathroom yard line. the kitchen sink will also stub out the rear and connect to the rear bathroom piping. we will access this piping within the kitchen cabinet. the washer line will run thru the garage to the front line. we will demolition concrete thru the garage to accomplish this, Jul 30, 2025).
How do I get alerts for new permits at 11912 Hornsby St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 11908 Hornsby StJan 8, 2026(kahlert patrick) - installation of circuit for elec. vehicle charging station - esip) · 43 m away
- 11913 Hornsby StJan 9, 2025Replace the underfloor sanitary sewer piping for the clothes washer in the garage. this includes breaking concrete thru the garage and running the new piping diagonally across the front yard and connecting to the sewer yard line · 49 m away
- 11916 Rennalee LoopJul 30, 2025Tunnel about 10 ft in from the front of the house to replace the cast iron below floor waste and vent piping with new pvc piping. tunnel about 10 ft in the rear of the house to the rear restroom for a similar repipe. this rear piping will run around the house and connect to the front bathroom yard line. the kitchen sink will also stub out the rear and connect to the rear bathroom piping. we will access this piping within the kitchen cabinet. the washer line will run thru the garage to the front line. we will demolition concrete thru the garage to accomplish this · 93 m away
- 11904 Tedford StNov 24, 2025New irrigation installation · 99 m away
- 11920 Rennalee LoopMar 29, 2024Replacement of complete existing central heat and air system with or without duct work · 100 m away
- 11905 Hornsby StOct 21, 2025105 tunnel below the foundation to replace entire drain system. 3 access holes - back back right · 104 m away
- 600 Jetta CtSep 3, 2024Replacement of complete existing central heat and air system with or without duct work · 122 m away
- 11911 Tedford StMar 11, 2026Kinsey will tunnel under home approx 100ft we will remove old cast iron pipe and replace with pvc in its place. we will hang pipe by hanger every 6ft from slab. pictures will be taken and engineer report will be done on tunnel. yard sewer line will also be replaced with new schedule40 pvc bed in sand add cleanouts every 50ft · 125 m away
- 11902 Rennalee LoopNov 8, 2025Replaced sewer piping under home · 126 m away
- 11902 Hornsby StFeb 20, 2019Spanish oak ridge annex ii resubdivision of lots a&b · 140 m away
- 11915 Rennalee LoopMay 1, 2026Ev charger installation · 150 m away
- 11924 Oakbrook DrJul 31, 2024Replacement of complete existing central heat and air system with or without duct work · 152 m away