11916 Rennalee Loop
Austin, TX 78753
Sewer and underfloor plumbing work at 11916 Rennalee Loop
Plumbing permits filed July 30, 2025, cover replacing underfloor waste and vent piping and cutting over from septic to city sewer at the home. The work descriptions also note concrete demolition in the garage to access piping. Both permits are listed as final.
Summarized from City of Austin records · updated Jul 30, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jul 30, 2025
- since Jul 30, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel about 10 ft in from the front of the house to replace the cast iron below floor waste and vent piping with new pvc piping. tunnel about 10 ft in the rear of the house to the rear restroom for a similar repipe. this rear piping will run around the house and connect to the front bathroom yard line. the kitchen sink will also stub out the rear and connect to the rear bathroom piping. we will access this piping within the kitchen cabinet. the washer line will run thru the garage to the front line. we will demolition concrete thru the garage to accomplish this
- AppliedJul 27, 2025
- IssuedJul 30, 2025
- WorkJul '25 – Aug '25
- Final inspectionAug 15, 2025
Passed final inspection Aug 15, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsTunnel about 10 ft in from the front of the house to replace the cast iron below floor waste and vent piping with new pvc piping. tunnel about 10 ft in the rear of the house to the rear restroom for a similar repipe. this rear piping will run around the house and connect to the front bathroom yard line. the kitchen sink will also stub out the rear and connect to the rear bathroom piping. we will access this piping within the kitchen cabinet. the washer line will run thru the garage to the front line. we will demolition concrete thru the garage to accomplish this
Tunnel about 10 ft in from the front of the house to replace the cast iron below floor waste and vent piping with new pvc piping. tunnel about 10 ft in the rear of the house to the rear restroom for a similar repipe. this rear piping will run around the house and connect to the front bathroom yard line. the kitchen sink will also stub out the rear and connect to the rear bathroom piping. we will access this piping within the kitchen cabinet. the washer line will run thru the garage to the front line. we will demolition concrete thru the garage to accomplish this
City of Austin permitPlumbing PermitFinal- Record
- 2025-093722 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Cutover from septic to city sewer only
Cutover from septic to city sewer only
City of Austin permitPlumbing PermitFinal- Record
- 2025-093724 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11916 Rennalee Loop
What work was permitted at 11916 Rennalee Loop?
Two City of Austin plumbing permits filed July 30, 2025, cover underfloor waste and vent piping replacement and a cutover from septic to city sewer.
Is a new home or building being built at 11916 Rennalee Loop?
The records provided describe plumbing work at the home, not new construction.
What is permit 2025-093722 PP for?
The July 30, 2025, permit describes replacing cast-iron underfloor waste and vent piping with PVC. It also details piping connections for the bathrooms, kitchen sink and washer.
What is permit 2025-093724 PP for?
The July 30, 2025, permit is for a cutover from septic to city sewer. The permit is listed as final.
Does the plumbing work involve the garage?
Yes. The description for permit 2025-093722 PP says concrete in the garage would be demolished to access piping.
Also being built nearby
All of 78753- 11920 Rennalee LoopMar 29, 2024Replacement of complete existing central heat and air system with or without duct work · 50 m away
- 11913 Hornsby StJan 9, 2025Replace the underfloor sanitary sewer piping for the clothes washer in the garage. this includes breaking concrete thru the garage and running the new piping diagonally across the front yard and connecting to the sewer yard line · 52 m away
- 11915 Rennalee LoopMay 1, 2026Ev charger installation · 57 m away
- 11902 Rennalee LoopNov 8, 2025Replaced sewer piping under home · 68 m away
- 11905 Hornsby StOct 21, 2025105 tunnel below the foundation to replace entire drain system. 3 access holes - back back right · 88 m away
- 11908 Hornsby StJan 8, 2026(kahlert patrick) - installation of circuit for elec. vehicle charging station - esip) · 92 m away
- 11912 Hornsby StMay 14, 2025Installation of a level 2 ev charger in the garage · 93 m away
- 301 Cedarbrook CtSep 26, 2024Replacement of complete existing central heat and air system with or without duct work · 141 m away
- 11901 Hornsby StJun 12, 2024Install level 2 ev charger per austin energys plug-in rebate guidelines · 154 m away
- 11902 Hornsby StFeb 20, 2019Spanish oak ridge annex ii resubdivision of lots a&b · 154 m away
- 11928 Oakbrook DrJul 16, 2024Demolition existing meter and install new 150 amp main breaker up to code meter service · 179 m away
- 306 Cedarbrook CtMar 21, 2024Cap off w&ww · 184 m away