groundranger
Historic · latest filing Jan 2025Residential

11913 Hornsby St

Austin, TX 78753

11913 Hornsby St: 1 project on record

City of Austin lists 1 filing across 1 project at 11913 Hornsby St, Austin, TX 78753. The most recent, filed January 9, 2025, covers: “Replace the underfloor sanitary sewer piping for the clothes washer in the garage. this includes breaking concrete thru the garage and running the new piping diagonally across the front yard and connecting to the sewer yard line”.

Compiled from City of Austin records · updated Jan 9, 2025

Projects
1
1 filings
Latest filing
Jan 9, 2025
since Jan 9, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replace the underfloor sanitary sewer piping for the clothes washer in the garage. this includes breaking concrete thru the garage and running the new piping diagonally across the front yard and connecting to the sewer yard line

  1. AppliedJan 6, 2025
  2. IssuedJan 9, 2025
  3. WorkJan '25 – Feb '25
  4. Final inspectionFeb 6, 2025

Passed final inspection Feb 6, 2025.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Replace the underfloor sanitary sewer piping for the clothes washer in the garage. this includes breaking concrete thru the garage and running the new piping diagonally across the front yard and connecting to the sewer yard line

    Replace the underfloor sanitary sewer piping for the clothes washer in the garage. this includes breaking concrete thru the garage and running the new piping diagonally across the front yard and connecting to the sewer yard line

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 11913 Hornsby St

What is being built at 11913 Hornsby St?

The latest filing (City of Austin permit 2025-001408 PP, January 9, 2025) covers replace the underfloor sanitary sewer piping for the clothes washer in the garage. this includes breaking concrete thru the garage and running the new piping diagonally across the front yard and connecting to the sewer yard line.

How many permits and filings does 11913 Hornsby St have?

1 filing across 1 project, from January 9, 2025 to January 9, 2025.

Is there other construction near 11913 Hornsby St?

Yes. Nearby filings include 11912 Hornsby St (installation of a level 2 ev charger in the garage, May 14, 2025); 11920 Rennalee Loop (replacement of complete existing central heat and air system with or without duct work, Mar 29, 2024); 11916 Rennalee Loop (tunnel about 10 ft in from the front of the house to replace the cast iron below floor waste and vent piping with new pvc piping. tunnel about 10 ft in the rear of the house to the rear restroom for a similar repipe. this rear piping will run around the house and connect to the front bathroom yard line. the kitchen sink will also stub out the rear and connect to the rear bathroom piping. we will access this piping within the kitchen cabinet. the washer line will run thru the garage to the front line. we will demolition concrete thru the garage to accomplish this, Jul 30, 2025).

How do I get alerts for new permits at 11913 Hornsby St?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78753
Email me when a new permit is filed