715 Kelso Dr
Dallas, TX 75211
Gas yard line work permitted at 715 Kelso Dr
A residential plumbing permit covers running a gas yard line from the house to the meter at 715 Kelso Dr. The City of Dallas permit was filed on September 23, 2026.
Summarized from City of Dallas records · updated Sep 23, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 23, 2026
- since Sep 23, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 715 Kelso Dr
What is being built at 715 Kelso Dr?
A City of Dallas residential plumbing permit describes running a gas yard line from the house to the meter.
When was the gas line permit filed at 715 Kelso Dr?
The permit was filed on September 23, 2026.
What is the permit number for work at 715 Kelso Dr?
The permit number is RES-PLM-26-010194.
Is this a new home construction project at 715 Kelso Dr?
The record is for a residential plumbing permit to run a gas yard line from the house to the meter; it does not describe new home construction.
What work is planned near The Israel Of God Church Development?
A permit at 715 Kelso Dr covers running a gas yard line from the house to the meter. The address is about 370 meters from The Israel Of God Church Development at 500 Furlong Drive.
Also being built nearby
All of 75211- 719 Kelso DrSep 17, 2026Gas test for meter release. gas provider requesting city approval · 5 m away
- 722 Kelso DrMar 17, 2026The scope of work will include digging an approximately 60-foot trench from the meter base to the main panel at the residence. we will be installing 2-inch conduit and pulling #2 conductors for a 100-amp service to the home.the trench will be excavated using a mechanical trencher · 16 m away
- 812 Cherry Laurel LnJul 21, 2025Gas test and water heater permit · 99 m away
- 819 Blue Grass DrOct 6, 2026Replace drains under theslab and yard · 116 m away
- 816 Kelso DrMay 14, 2025Run new feeders from meter to disconnect · 118 m away
- 831 Blue Grass DrNov 13, 2026New line in the yard....gas test needed · 131 m away
- 826 Blue Grass DrMar 25, 2026Repairing gas pipeline, install 2 valves inside of house · 136 m away
- 706 Cherry Laurel LnNov 9, 2026Gas test · 138 m away
- 828 Kelso DrJan 26, 2021Gas test · 143 m away
- 824 Keeneland CtSep 15, 2025Demolish existing accès concrete stairs and build brand new, build a retainer wall around front garde and build a driveway and approach in front, right side of property · 187 m away
- 833 Keeneland CtJul 9, 2025Relocate 200 amp panel and add disconnect · 189 m away
- 848 Keeneland CtJul 16, 2025Replacement of 2.5 ton a/c and air handler only · 192 m away