816 Kelso Dr
Dallas, TX 75211
816 Kelso Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 816 Kelso Dr, Dallas, TX 75211. The most recent, filed May 14, 2025, covers: “Run new feeders from meter to disconnect”.
Compiled from City of Dallas records · updated May 14, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 14, 2025
- since May 14, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 816 Kelso Dr
What is being built at 816 Kelso Dr?
The latest filing (City of Dallas permit RES-ELC-25-000123, May 14, 2025) covers run new feeders from meter to disconnect.
How many permits and filings does 816 Kelso Dr have?
1 filing across 1 project, from May 14, 2025 to May 14, 2025.
Is there other construction near 816 Kelso Dr?
Yes. Nearby filings include 828 Kelso Dr (gas test, Jan 26, 2021); 831 Blue Grass Dr (new line in the yard....gas test needed, Nov 13, 2026); 819 Blue Grass Dr (replace drains under theslab and yard, Oct 6, 2026).
How do I get alerts for new permits at 816 Kelso Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75211- 828 Kelso DrJan 26, 2021Gas test · 25 m away
- 831 Blue Grass DrNov 13, 2026New line in the yard....gas test needed · 94 m away
- 819 Blue Grass DrOct 6, 2026Replace drains under theslab and yard · 107 m away
- 812 Cherry Laurel LnJul 21, 2025Gas test and water heater permit · 109 m away
- 826 Blue Grass DrMar 25, 2026Repairing gas pipeline, install 2 valves inside of house · 109 m away
- 5853 Keeneland PkwyMay 21, 2026Gas test on house that has been vacant · 109 m away
- 722 Kelso DrMar 17, 2026The scope of work will include digging an approximately 60-foot trench from the meter base to the main panel at the residence. we will be installing 2-inch conduit and pulling #2 conductors for a 100-amp service to the home.the trench will be excavated using a mechanical trencher · 109 m away
- 719 Kelso DrSep 17, 2026Gas test for meter release. gas provider requesting city approval · 113 m away
- 715 Kelso DrSep 23, 2026Running gas yard line from the house to the meter · 118 m away
- 824 Keeneland CtSep 15, 2025Demolish existing accès concrete stairs and build brand new, build a retainer wall around front garde and build a driveway and approach in front, right side of property · 185 m away
- 5816 Keeneland PkwyMar 25, 2026Install a new electrical service 100 amps, 120/240 volts to feed an existing sign · 199 m away
- 833 Keeneland CtJul 9, 2025Relocate 200 amp panel and add disconnect · 206 m away