833 Keeneland Ct
Dallas, TX 75211
833 Keeneland Ct: 1 project on record
City of Dallas lists 1 filing across 1 project at 833 Keeneland Ct, Dallas, TX 75211. The most recent, filed July 9, 2025, covers: “Relocate 200 amp panel and add disconnect”.
Compiled from City of Dallas records · updated Jul 9, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 9, 2025
- since Jul 9, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 833 Keeneland Ct
What is being built at 833 Keeneland Ct?
The latest filing (City of Dallas permit RES-ELC-25-001260, July 9, 2025) covers relocate 200 amp panel and add disconnect.
How many permits and filings does 833 Keeneland Ct have?
1 filing across 1 project, from July 9, 2025 to July 9, 2025.
Is there other construction near 833 Keeneland Ct?
Yes. Nearby filings include 824 Keeneland Ct (demolish existing accès concrete stairs and build brand new, build a retainer wall around front garde and build a driveway and approach in front, right side of property, Sep 15, 2025); 848 Keeneland Ct (replacement of 2.5 ton a/c and air handler only, Jul 16, 2025); 812 Cherry Laurel Ln (gas test and water heater permit, Jul 21, 2025).
How do I get alerts for new permits at 833 Keeneland Ct?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75211- 824 Keeneland CtSep 15, 2025Demolish existing accès concrete stairs and build brand new, build a retainer wall around front garde and build a driveway and approach in front, right side of property · 31 m away
- 848 Keeneland CtJul 16, 2025Replacement of 2.5 ton a/c and air handler only · 56 m away
- 812 Cherry Laurel LnJul 21, 2025Gas test and water heater permit · 103 m away
- 706 Cherry Laurel LnNov 9, 2026Gas test · 167 m away
- 719 Kelso DrSep 17, 2026Gas test for meter release. gas provider requesting city approval · 189 m away
- 715 Kelso DrSep 23, 2026Running gas yard line from the house to the meter · 189 m away
- 722 Kelso DrMar 17, 2026The scope of work will include digging an approximately 60-foot trench from the meter base to the main panel at the residence. we will be installing 2-inch conduit and pulling #2 conductors for a 100-amp service to the home.the trench will be excavated using a mechanical trencher · 201 m away
- 816 Kelso DrMay 14, 2025Run new feeders from meter to disconnect · 206 m away
- 828 Kelso DrJan 26, 2021Gas test · 223 m away
- 710 Bimebella LnAug 12, 2025Foundation repair-install 8 steel piers under the home to stabilize the foundation · 260 m away
- 5853 Keeneland PkwyMay 21, 2026Gas test on house that has been vacant · 281 m away
- 819 Blue Grass DrOct 6, 2026Replace drains under theslab and yard · 283 m away