828 Kelso Dr
Dallas, TX 75211
828 Kelso Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 828 Kelso Dr, Dallas, TX 75211. The most recent, filed January 26, 2021, covers: “Gas test”.
Compiled from City of Dallas records · updated Jan 26, 2021
- Projects
- 1
- 1 filings
- Latest filing
- Jan 26, 2021
- since Jan 26, 2021
- Largest scope
- —
- Listed value
- $8
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 828 Kelso Dr
What is being built at 828 Kelso Dr?
The latest filing (City of Dallas permit 2101263064, January 26, 2021) covers gas test.
How many permits and filings does 828 Kelso Dr have?
1 filing across 1 project, from January 26, 2021 to January 26, 2021.
How much is the construction at 828 Kelso Dr worth?
Permits at this address list about $8 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 828 Kelso Dr?
Yes. Nearby filings include 816 Kelso Dr (run new feeders from meter to disconnect, May 14, 2025); 5853 Keeneland Pkwy (gas test on house that has been vacant, May 21, 2026); 831 Blue Grass Dr (new line in the yard....gas test needed, Nov 13, 2026).
How do I get alerts for new permits at 828 Kelso Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75211- 816 Kelso DrMay 14, 2025Run new feeders from meter to disconnect · 25 m away
- 5853 Keeneland PkwyMay 21, 2026Gas test on house that has been vacant · 84 m away
- 831 Blue Grass DrNov 13, 2026New line in the yard....gas test needed · 97 m away
- 826 Blue Grass DrMar 25, 2026Repairing gas pipeline, install 2 valves inside of house · 112 m away
- 819 Blue Grass DrOct 6, 2026Replace drains under theslab and yard · 115 m away
- 812 Cherry Laurel LnJul 21, 2025Gas test and water heater permit · 131 m away
- 722 Kelso DrMar 17, 2026The scope of work will include digging an approximately 60-foot trench from the meter base to the main panel at the residence. we will be installing 2-inch conduit and pulling #2 conductors for a 100-amp service to the home.the trench will be excavated using a mechanical trencher · 133 m away
- 719 Kelso DrSep 17, 2026Gas test for meter release. gas provider requesting city approval · 138 m away
- 715 Kelso DrSep 23, 2026Running gas yard line from the house to the meter · 143 m away
- 5816 Keeneland PkwyMar 25, 2026Install a new electrical service 100 amps, 120/240 volts to feed an existing sign · 175 m away
- 824 Keeneland CtSep 15, 2025Demolish existing accès concrete stairs and build brand new, build a retainer wall around front garde and build a driveway and approach in front, right side of property · 201 m away
- 833 Keeneland CtJul 9, 2025Relocate 200 amp panel and add disconnect · 223 m away