719 Kelso Dr
Dallas, TX 75211
Gas test permit filed for 719 Kelso Dr
A residential plumbing permit indicates a gas test was requested for meter release at 719 Kelso Dr. The City of Dallas record was filed on September 17, 2026; it does not describe new construction.
Summarized from City of Dallas records · updated Sep 17, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 17, 2026
- since Sep 17, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 719 Kelso Dr
What is being built at 719 Kelso Dr in Dallas?
The permit record does not indicate new construction. It describes a gas test requested for meter release.
What work is permitted at 719 Kelso Dr?
A City of Dallas residential plumbing permit describes a gas test for meter release. The record was filed September 17, 2026, under permit RES-PLM-26-009933.
When was the permit filed for 719 Kelso Dr?
The City of Dallas record shows a filing date of September 17, 2026.
Is a new home being built at 719 Kelso Dr?
The available permit describes a gas test for meter release, not construction of a new home.
What is happening near The Israel Of God Church Development on Furlong Drive?
At 719 Kelso Dr, about 373 meters away, a residential plumbing permit was filed for a gas test requested for meter release.
What is permit RES-PLM-26-009933 for?
The City of Dallas permit record describes a gas test requested by the gas provider for meter release at 719 Kelso Dr. It was filed September 17, 2026.
Also being built nearby
All of 75211- 715 Kelso DrSep 23, 2026Running gas yard line from the house to the meter · 5 m away
- 722 Kelso DrMar 17, 2026The scope of work will include digging an approximately 60-foot trench from the meter base to the main panel at the residence. we will be installing 2-inch conduit and pulling #2 conductors for a 100-amp service to the home.the trench will be excavated using a mechanical trencher · 14 m away
- 812 Cherry Laurel LnJul 21, 2025Gas test and water heater permit · 97 m away
- 819 Blue Grass DrOct 6, 2026Replace drains under theslab and yard · 113 m away
- 816 Kelso DrMay 14, 2025Run new feeders from meter to disconnect · 113 m away
- 831 Blue Grass DrNov 13, 2026New line in the yard....gas test needed · 127 m away
- 826 Blue Grass DrMar 25, 2026Repairing gas pipeline, install 2 valves inside of house · 133 m away
- 828 Kelso DrJan 26, 2021Gas test · 138 m away
- 706 Cherry Laurel LnNov 9, 2026Gas test · 141 m away
- 824 Keeneland CtSep 15, 2025Demolish existing accès concrete stairs and build brand new, build a retainer wall around front garde and build a driveway and approach in front, right side of property · 185 m away
- 833 Keeneland CtJul 9, 2025Relocate 200 amp panel and add disconnect · 189 m away
- 848 Keeneland CtJul 16, 2025Replacement of 2.5 ton a/c and air handler only · 193 m away