309 Farley Dr
Austin, TX 78753
Electrical service replacement permitted at 309 Farley Dr
A City of Austin permit filed November 20, 2026, covers relocating and replacing the existing 200-amp electrical service at 309 Farley Dr. The service rating is to remain 200 amps.
Summarized from City of Austin records · updated Nov 20, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 20, 2026
- since Nov 20, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayRelocate and replace existing 200a electrical service including meter socket and service disconnect. service rating to remain 200a
- AppliedNov 17, 2026
- IssuedNov 20, 2026
- WorkNov '26 – May '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectRelocate and replace existing 200a electrical service including meter socket and service disconnect. service rating to remain 200a
Relocate and replace existing 200a electrical service including meter socket and service disconnect. service rating to remain 200a
City of Austin permitElectrical PermitActive- Record
- 2026-150572 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 309 Farley Dr
What is happening at 309 Farley Dr in Austin?
A City of Austin electrical permit indicates that the existing electrical service will be relocated and replaced. The permit was filed November 20, 2026, under number 2026-150572 EP.
What electrical work is permitted at 309 Farley Dr?
The permit covers relocating and replacing the existing 200-amp electrical service, including the meter socket and service disconnect.
Will the electrical service at 309 Farley Dr be upgraded?
The permit says the service rating will remain 200 amps.
When was the permit filed for 309 Farley Dr?
The City of Austin filed electrical permit 2026-150572 EP on November 20, 2026.
Is a new home being built at 309 Farley Dr?
The listed permit covers work on the existing electrical service; it does not describe construction of a new home.
Also being built nearby
All of 78753- 205 Farley DrMar 2, 2007Carroll collier site plan - withdrawn · 69 m away
- 402 Victor StJan 28, 2009Eddie ludwig subd, amended plat of lots 13-a & 13-b, the subdivision of lot 13 — eddie ludwig subd, amended plat of lots 13-a & 13-b, the subdivision of lot 13 · 85 m away
- 109 Farley DrJan 16, 2024Disconnect old sewer and decommission then connect new sewer line to city sewer tap · 108 m away
- 305 Victor StSep 2, 2025Relocate and upgrade existing electrical service to 350a per ec: relocating the service because it currently enters the building underground. the new service will be overhead. after meeting onsite with aes ryan kenney it was determined that the upgraded overhead service should be relocated to the opposite side of the building closer to aes telephone pole where the overhead drop will originate. no other systems will be affected; this is a service upgrade · 116 m away
- 500 Victor StMar 2, 2007500 victor subdivision — 500 victor subdivision · 116 m away
- 601 Farley DrMar 4, 2026Foundation repair install 20ft 4x6 beam 5 new sonotubes reshim 550 sq ft · 151 m away
- 110 Farley DrMar 2, 2007Lamar body shop · 156 m away
- 203 Victor StDec 29, 2025Capital mortuary addition (with r sp-2017-0508c) · 162 m away
- 600-1/2 Victor StAug 14, 2012Robles addition · 162 m away
- 610 Farley DrMar 2, 2007Filebox addition · 171 m away
- 405 Braker LnDec 27, 2007Dollar general-braker · 178 m away
- 607 Farley DrAug 19, 2023Vu auto services (with r sp-2020-0196c) · 178 m away