11900 Buckingham Rd
Austin, TX 78759
Permit filed for PV tie-in and electrical upgrades
An electrical permit for a photovoltaic (PV) component tie-in and electrical service upgrades was filed at 11900 Buckingham Rd on November 20, 2026. The permit describes disconnecting and reconnecting power, upgrading the main service panel, and upgrading the revenue meter.
Summarized from City of Austin records · updated Nov 20, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 20, 2026
- since Nov 20, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayNeal 40-31791 - disconnect/reconnect power to tie in pv component and upgrading msp to _125__ amps. _100__ main breaker. upgrading revenue meter to 200 amps only
- AppliedNov 16, 2026
- IssuedNov 20, 2026
- WorkNov '26 – May '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectNeal 40-31791 - disconnect/reconnect power to tie in pv component and upgrading msp to _125__ amps. _100__ main breaker. upgrading revenue meter to 200 amps only
Neal 40-31791 - disconnect/reconnect power to tie in pv component and upgrading msp to _125__ amps. _100__ main breaker. upgrading revenue meter to 200 amps only
City of Austin permitElectrical PermitActive- Record
- 2026-150377 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11900 Buckingham Rd
What is being built at 11900 Buckingham Rd?
A City of Austin electrical permit indicates work to tie in a PV component and upgrade electrical service. It does not specify the full scope of a solar installation.
Is a solar installation planned at 11900 Buckingham Rd?
The November 20, 2026 permit describes tying in a PV component. It does not provide details about the panels or the full installation.
When was the permit filed for 11900 Buckingham Rd?
The permit was filed on November 20, 2026.
What electrical upgrades are planned at 11900 Buckingham Rd?
The permit describes upgrading the main service panel and upgrading the revenue meter to 200 amps, along with disconnecting and reconnecting power for the PV tie-in.
What is the permit number for the work at 11900 Buckingham Rd?
The City of Austin permit number is 2026-150377 EP. It is listed as an active electrical permit.
Also being built nearby
All of 78759- 11808 Buckingham RdNov 6, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 73 m away
- 11809 Buckingham RdAug 27, 2026Express - removing and replacing deck and shingles · 76 m away
- 11906 Barrington WayMay 14, 2024Replacement of complete existing central heat and air system with or without duct work · 91 m away
- 11907 Buckingham RdOct 12, 2024Replacement of complete existing central heat and air system with or without duct work · 97 m away
- 11812 Knights BrgSep 9, 2025Express: remove and replace 16 windows · 98 m away
- 11806 Knights BrgOct 1, 2024New inground gunite pool with concrete deck. remove 64sq of existing concrete pad · 103 m away
- 11810 Barrington WayMar 6, 2026(mcguire charles) - installation of circuit for elec. vehicle charging station - esip · 109 m away
- 11909 Buckingham RdDec 8, 2025Replacement of complete existing central heat and air system with or without duct work · 114 m away
- 11809 Knights BrgNov 4, 2026Replacement of an existing water heater · 140 m away
- 11803 Knights BrgAug 28, 2026Rebuild electrical service: new meter can main breaker panel grounding and bonding ae schedule shutdown required · 155 m away
- 7800 Parliament PlJul 26, 2024Service upgrade · 163 m away
- 11801 Buckingham RdAug 25, 2026Express: roof and deck replacement (not going past the decking) · 164 m away
More solar installs in 78759.